{"id":2321,"date":"2025-06-06T12:56:50","date_gmt":"2025-06-06T10:56:50","guid":{"rendered":"https:\/\/www.sagasta.cz\/prelozka-silnic-ii-156-a-ii-157-3-etapa-pro-jihocesky-kraj\/"},"modified":"2025-12-16T15:00:24","modified_gmt":"2025-12-16T14:00:24","slug":"relocation-of-roads-ii-156-and-ii-157-stage-3-for-the-south-bohemian-region","status":"publish","type":"post","link":"https:\/\/www.sagasta.cz\/en\/relocation-of-roads-ii-156-and-ii-157-stage-3-for-the-south-bohemian-region\/","title":{"rendered":"Relocation of roads II\/156 and II\/157 \u2013 Stage 3 for the South Bohemian Region"},"content":{"rendered":"\n<p>For the South Bohemian Region, we are beginning to process the DUSP + PDPS construction project &#8220;Relocation of roads II\/156 and II\/157 \u2013 Stage 3.&#8221; <\/p>\n\n<p>The &#8220;Relocation of Roads II\/156 and II\/157 \u2013 Stage 3&#8221; is part of a&nbsp;series of construction projects ensuring the connection of the D3 motorway and Road I\/34 from Jind\u0159ich\u016fv Hradec with a&nbsp;new connection to Road II\/156 in the direction of Nov\u00e9 Hrady and Road II\/157 in the direction of Srubec. The purpose of the project is to supplement the main transport backbone of \u010cesk\u00e9 Bud\u011bjovice&#8217;s&nbsp;urban roads and relieve the existing congested Class II thoroughfares. Another reason is to improve the city&#8217;s&nbsp;connection to the higher-level road network (the planned D3 motorway route). In the Regional Spatial Development Plan, this construction is described as a&nbsp;&#8220;railway-side road.&#8221;     <\/p>\n\n<h2 class=\"wp-block-heading\">Relocation of roads II\/156 and II\/157 \u2013 connecting the center and &#8220;Zan\u00e1dra\u017e\u00ed&#8221;<\/h2>\n\n<p>&#8220;Relocation of roads II\/156 and II\/157 \u2013 Stage 3&#8221; involves the construction of an underpass beneath the railway station on the M\u00e1nesova \u2013 Dobrovodsk\u00e1\/U L\u00e1vky route. <\/p>\n\n<p>The relocation of roads II\/156 and II\/157 consists of a&nbsp;total of six stages. 1., 2.&nbsp;and part of stage 4 have already been completed. Stage 3 involves the construction of a&nbsp;tunnel structure under the railway station, which is connected to the existing road network on both sides by grade-separated junctions. The purpose of the relocation is to connect the city center and the &#8220;Zan\u00e1dra\u017en\u00ed&#8221; road, thereby relieving congested roads and creating an alternative to the underpass on Rudolfovsk\u00e1 Street with its limited clearance height.    <\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.sagasta.cz\/wp-content\/uploads\/2025\/06\/481468367-672242775325520-257961145962328029-n-1024x683.jpg\" alt=\"Relocation of roads II\/156 and II\/157 &#x2013; 3. etapa\" class=\"wp-image-2132\" srcset=\"https:\/\/www.sagasta.cz\/wp-content\/uploads\/2025\/06\/481468367-672242775325520-257961145962328029-n-1024x683.jpg 1024w, https:\/\/www.sagasta.cz\/wp-content\/uploads\/2025\/06\/481468367-672242775325520-257961145962328029-n-300x200.jpg 300w, https:\/\/www.sagasta.cz\/wp-content\/uploads\/2025\/06\/481468367-672242775325520-257961145962328029-n-768x512.jpg 768w, https:\/\/www.sagasta.cz\/wp-content\/uploads\/2025\/06\/481468367-672242775325520-257961145962328029-n-1536x1024.jpg 1536w, https:\/\/www.sagasta.cz\/wp-content\/uploads\/2025\/06\/481468367-672242775325520-257961145962328029-n.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>For the South Bohemian Region, we are beginning to process the DUSP + PDPS construction project &#8220;Relocation of roads II\/156 and II\/157 \u2013 Stage 3.&#8221; The &#8220;Relocation of Roads II\/156 and II\/157 \u2013 Stage 3&#8221; is part of a&nbsp;series of construction projects ensuring the connection of the D3 motorway and Road I\/34 from Jind\u0159ich\u016fv Hradec [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2315,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[28],"tags":[],"class_list":["post-2321","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-road-constructions"],"_links":{"self":[{"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/posts\/2321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/comments?post=2321"}],"version-history":[{"count":0,"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/posts\/2321\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/media\/2315"}],"wp:attachment":[{"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/media?parent=2321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/categories?post=2321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sagasta.cz\/en\/wp-json\/wp\/v2\/tags?post=2321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}