I/3 Netřebice, Bridge No. 3-117 — Netřebice

Client

Directorate of Roads and Motorways

Investment costs

12 261 369 CZK

Project preparation

2018

Project implementation

2020

Project stage

DSP, PDPS

Project description:

SO 201 – This is a single-span road bridge over a railway line. The bridge length is 24 m, with a main-span width of 11.90 m and an overall bridge width of 11.9 m. As part of the bridge repair, the existing bearing corbels and  he upper parts of the stone abutments were demolished. The new bearing corbels and the upper sections of the wing walls are made of reinforced concrete and are connected to the existing substructure using reinforcement bonded into drilled holes with chemical anchors.
New concrete wing walls and gabion walls follow the bearing corbels. The load-bearing structure consists of a monolithic reinforced-concrete deck slab made of C30/37 concrete with embedded steel rolled IPE 400 beams.

Project Manager: Ing. Vít Hoznour

Years on the Market
0
Employees
0
Projects
0 +
Turnover for 2024
0

References