I/29 Bridge over the River Smutná, structure no. 29-009 — Smutná River

Client

Directorate of Roads and Motorways

Investment costs

CZK 9,797,110

Project preparation

2018

Project implementation

2020

Project stage

DSP, PDPS

Project description:

SO 201 – Reconstruction of a vaulted road bridge over a watercourse, consisting of three spans with clear widths of  6.31 m + 6.34 m + 6.31 m. The total bridge length is 22.16 m. The reconstruction included the repair ofthe stone substructure and the existing load-bearing structure, the demolition of the existing reinforced-concrete widening slab, which was replaced with a new reinforced-concrete slab. New gabion walls connect to the bridge structure.

Project Manager: Ing. Vít Hoznour